What checks are required before commissioning the gas detection system?
04/07 2026
Before powering on, verify that the wiring is secure and the insulation resistance meets requirements. Check that the power supply voltage matches the device rating (e.g., 24V DC) and ensure there are no short circuits. Also, confirm that the detector is firmly mounted and the sensor protective cap has been removed if required.




